Compare Residual Recurrent Neural Network Structures for Digital Predistortion Design
This example shows how to design, train, test, and compare several residual recurrent neural network (RNN) structures to apply digital predistortion (DPD). DPD offsets the effects of nonlinearities in a power amplifier (PA). In this example, you:
Design and train LSTM, BiLSTM, GRU, BiGRU, and their residual versions as a DPD.
Perform hyperparameter optimization and comparison using the Experiment Manager.
Test the DPD structures using a real PA.
Compare the results to that of multi-layer perceptron (MLP) and cross-term memory polynomial DPD.
Introduction
This example focuses on offline training of the RNN-based DPD (RNN-DPD). For details on offline training using an MLP, see theNeural Network for Digital Predistortion Design-Offline Training example. The RNN-DPD consists of L units of RNN followed by three fully connected layers with N1, N2, and N3 output neurons. To test the effect of residual training, add a bypass path. Split the complex input, u, into a 2-by-1 array of in-phase and quadrature components and combine the 2-by-1 output of the NN into a complex number, y.
L = 50; % Number of RNN units N1 = 100; % Number of outputs of 1st fully connected layer N2 = 50; % Number of outputs of 2nd fully connected layer N3 = 2; % Number of outputs of 3rd fully connected layer
RNN Structures
Design and train four different RNN structures together with their residual counterparts as shown in [1].
LSTM
A long short-term memory (LSTM) neural network can learn long-term dependencies between time steps of sequence data. The core components of an LSTM neural network are a sequence input layer and an LSTM layer. A sequence input layer inputs sequence or time series data into the neural network. An LSTM layer learns long-term dependencies between time steps of sequence data. For more information, see Long Short-Term Memory Neural Networks (Deep Learning Toolbox).
layers = [... sequenceInputLayer(2,'Name','input','MinLength',1) lstmLayer(L,"Name","lstm","OutputMode","sequence") fullyConnectedLayer(N1,'Name','linear1') leakyReluLayer(0.01,'Name','leakyRelu1') fullyConnectedLayer(N2,'Name','linear2') leakyReluLayer(0.01,'Name','leakyRelu2') fullyConnectedLayer(N3,'Name','linearOutput') ]; netLSTM = dlnetwork(layers,Initialize=false);
BiLSTM
A bidirectional LSTM (BiLSTM) operation learns bidirectional long-term dependencies between time steps of time series or sequence data. These dependencies are useful when you want the network to learn from the complete time series at each time step. This network introduces a delay equal to the number of samples in the input sequence. For more information, see the bilstmLayer
(Deep Learning Toolbox) function.
layers = [... sequenceInputLayer(2,'Name','input','MinLength',1) bilstmLayer(L,"Name","bilstm","OutputMode","sequence") fullyConnectedLayer(N1,'Name','linear1') leakyReluLayer(0.01,'Name','leakyRelu1') fullyConnectedLayer(N2,'Name','linear2') leakyReluLayer(0.01,'Name','leakyRelu2') fullyConnectedLayer(N3,'Name','linearOutput') ]; netBiLSTM = dlnetwork(layers,Initialize=false);
GRU
The gated recurrent unit (GRU) layer allows a network to learn dependencies between time steps in time series and sequence data. The GRU solves the vanishing gradient problem of standard RNNs by using two gates. The update gate determines how much of the past information needs to be passed along to the future and the reset gate decides how much of the past information to forget. For more information, see the gruLayer
(Deep Learning Toolbox) function.
layers = [... sequenceInputLayer(2,'Name','input','MinLength',1) gruLayer(L,"Name","gru","OutputMode","sequence") fullyConnectedLayer(N1,'Name','linear1') leakyReluLayer(0.01,'Name','leakyRelu1') fullyConnectedLayer(N2,'Name','linear2') leakyReluLayer(0.01,'Name','leakyRelu2') fullyConnectedLayer(N3,'Name','linearOutput') ]; netGRU = dlnetwork(layers,Initialize=false);
BiGRU
The bidirectional GRU (BiGRU) layer extends the GRU model by processing the data in both forward and backward directions, similar to BiLSTM. This approach allows the model to capture information from both past (backward) and future (forward) states. Implement a BiGRU layer using helperFlipLayer
and gruLayer
functions.
net = dlnetwork; net = addLayers(net,sequenceInputLayer(2,'Name','input','MinLength',1)); net = addLayers(net,gruLayer(L,"Name","gru1","OutputMode","sequence")); layers = [helperFlipLayer("flip1") gruLayer(L,"Name","gru2","OutputMode","sequence") helperFlipLayer("flip2")]; net = addLayers(net,layers); layers = [concatenationLayer(1, 2, Name="cat") fullyConnectedLayer(N1,'Name','linear1') leakyReluLayer(0.01,'Name','leakyRelu1') fullyConnectedLayer(N2,'Name','linear2') leakyReluLayer(0.01,'Name','leakyRelu2') fullyConnectedLayer(N3,'Name','linearOutput') ]; net = addLayers(net,layers); net = connectLayers(net, "input", "gru1"); net = connectLayers(net, "gru1", "cat/in1"); net = connectLayers(net, "input", "flip1"); netBiGRU = connectLayers(net, "flip2", "cat/in2");
Prepare Data
Generate training, validation, and testing data. Use the training and validation data to train the RNN-DPD. Use the test data to evaluate the RNN-DPD performance. For details, see the Data Preparation for Neural Network Digital Predistortion Design example.
Choose Data Source
Choose the data source for the system. This example uses an NXP™ Airfast LDMOS Doherty PA, which is connected to a local NI™ VST, as described in the Power Amplifier Characterization example. If you do not have access to a PA, run the example with the simulated PA or saved data. The simulated PA uses a neural network PA model, which is trained using data captured from the PA using an NI VST. The example downloads data files including the results of the Example Manager runs. The saved data option uses a lookup table and not all input signals have a saved output signal.
dataSource ="Simulated PA"; helperNNDPDDownloadData("rnn")
Starting download of data files from: https://www.mathworks.com/supportfiles/spc/NNDPD/rnn_dpd.zip Download complete. Extracting files. Extract complete.
Generate Training Data
Generate oversampled OFDM signals.
[txWaveTrain,txWaveVal,txWaveTest,qamRefSymTrain,qamRefSymVal, ...
qamRefSymTest,ofdmParams] = generateOversampledOFDMSignals;
Fs = ofdmParams.SampleRate;
Pass signals through the PA using the helperNNDPDPowerAmplifier
System object™.
pa = helperNNDPDPowerAmplifier(DataSource=dataSource,SampleRate=Fs); paOutputTrain = pa(txWaveTrain); paOutputVal = pa(txWaveVal);
Preprocess the data to generate input vectors containing IQ samples. Create subsequences using a sliding window of length sequenceLength
. Move the window stepSize
samples to create the next subsequence. Each subsequence is a training sample. Use 1/3 the number of training samples for validation.
normFactor = std(txWaveTest); sequenceLength =300; stepSize =
100; dataLength = size(txWaveTrain,1); numSeq = floor((dataLength-sequenceLength)/stepSize); inputCellTrain = cell(numSeq,1); outputCellTrain = cell(numSeq,1); dataCnt = 1; for p=1:stepSize:dataLength-sequenceLength inputCellTrain{dataCnt} = [real(paOutputTrain(p:sequenceLength+p-1,1)) ... imag(paOutputTrain(p:sequenceLength+p-1,1))]/normFactor; outputCellTrain{dataCnt} = [real(txWaveTrain(p:sequenceLength+p-1,1)) ... imag(txWaveTrain(p:sequenceLength+p-1,1))]/normFactor; dataCnt = dataCnt+1; end dataLength = size(txWaveVal,1) / 3; numSeq = floor((dataLength-sequenceLength)/stepSize); inputCellVal = cell(numSeq,1); outputCellVal = cell(numSeq,1); dataCnt = 1; for p=1:stepSize:dataLength-sequenceLength inputCellVal{dataCnt} = [real(paOutputVal(p:sequenceLength+p-1,1)) ... imag(paOutputVal(p:sequenceLength+p-1,1))]/normFactor; outputCellVal{dataCnt} = [real(txWaveVal(p:sequenceLength+p-1,1)) ... imag(txWaveVal(p:sequenceLength+p-1,1))]/normFactor; dataCnt = dataCnt+1; end
Compare Networks and Optimize Hyperparameters
This example optimizes the hyperparameters L
and N1
while comparing the RNN structures. Use Experiment Manager to train and obtain validation loss and RMSE values in parallel.
Configure Experiment Manager
Configure Experiment Manager to sweep over the hyperparameters for the eight RNN structures: LSTM, Residual LSTM, BiLSTM, Residual BiLSTM, GRU, Residual GRU, BiGRU, Residual BiGRU. To reduce the number of hyperparameters, sweep over L and N1, and set N2 as half of N1. Configure the hyperparameters as follows:
Strategy: Exhaustive sweep
L: 10:30:100
N1: 10:30:100
Network structure: LSTM, BiLSTM, GRU, BiGRU
Residual connection active: false, true
The training algorithm initializes the neural network with random weights. As a result, the trained network can converge to a different local minima. Add an extra parameter, repeat
, to train the neural network multiple times. Select the best one.
Set Mode to Simultaneous
to run the trials in parallel. If you have access to a cluster, you can also run the trials on a cluster and massively parallelize hyperparameter optimization. On a PC with an AMD EPYC 7262 8-core processor, 384 trials with validation patience of 3 and 8 workers, run in about 12 hours.
The rnnDpdExperimentSetup
function sets up the network and generates training data. The emACPR
, emEVM
, emNME
functions calculate the metrics.
The rnn_dpd.zip
file contains a preconfigured project and results.
exampleDir = pwd;
projectName = "rnn_dpd";
projRoot = fullfile(pwd,projectName);
To open the project, start Experiment Manager and open the following file.
disp(fullfile(".","rnn_dpd","Rnn_dpd.prj"))
.\rnn_dpd\Rnn_dpd.prj
Explore Results
Experiment Manager shows the results of each trial as a table. Export the results table by using the Export > Results Table button.
The rnnDPDMultiNetworkRepeatTrainResults.mat
file contains the results exported from Results 1 of the MultiNetworkRepeatTrain
experiment. Load the results table and plot filled contours to examine the hyperparameter space for EVM, ACPR, and NMSE values. Opening the project changes the current directory. Reset the current directory.
cd(exampleDir) switch dataSource case "Simulated PA" load rnnDPDMultiNetworkRepeatTrainResults.mat resultsTable case "Saved data" load rnnDPDMultiNetworkRepeatSavedDataTrainResults.mat resultsTable otherwise error("Saved results are not available when data source is %d",dataSource) end resultsTable
resultsTable=384×4 table
Experiment Details Hyperparameters Information Metrics
_______________________________________________ ______________________________________________________________________________________ _____________________________________________________________________________________________________________________________________________________________________ ________________________________________________________________
Trial Status Progress Elapsed Time repeat L N1 networkStructure residual validationPatience maxEpochs Epoch Iteration LearnRateSchedule LearnRate ValidationFrequency ValidationPatience ObjectiveMetric OutputNetwork HardwareResource TrainingRMSE TrainingLoss ValidationRMSE ValidationLoss
_____ __________ ________ ____________ ______ ___ __ ________________ ________ __________________ _________ ____________ _________ _________________ __________ ___________________ __________________ _______________ _________________ ________________ ____________ ____________ ______________ ______________
1 "Complete" 100 00:18:33 1 10 10 "lstm" false 3 120 "120 of 120" 26280 "Piecewise" 0.00029007 654 3 "Loss" "Best validation" "Single CPU" 0.018194 0.00033101 0.019196 0.00036849
2 "Complete" 100 00:19:36 2 10 10 "lstm" false 3 120 "120 of 120" 26280 "Piecewise" 0.00029007 654 3 "Loss" "Best validation" "Single CPU" 0.017161 0.00029449 0.018375 0.00033764
3 "Complete" 100 00:19:22 3 10 10 "lstm" false 3 120 "120 of 120" 26280 "Piecewise" 0.00029007 654 3 "Loss" "Best validation" "Single CPU" 0.02323 0.00053964 0.020154 0.00040619
4 "Complete" 100 00:12:24 1 40 10 "lstm" false 3 120 "39 of 120" 8502 "Piecewise" 0.001625 654 3 "Loss" "Best validation" "Single CPU" 0.021593 0.00046627 0.023218 0.00053908
5 "Complete" 100 00:10:45 2 40 10 "lstm" false 3 120 "36 of 120" 7848 "Piecewise" 0.001625 654 3 "Loss" "Best validation" "Single CPU" 0.019319 0.00037324 0.020787 0.00043208
6 "Complete" 100 00:15:14 3 40 10 "lstm" false 3 120 "51 of 120" 11118 "Piecewise" 0.0010563 654 3 "Loss" "Best validation" "Single CPU" 0.021486 0.00046164 0.019619 0.00038491
7 "Complete" 100 00:17:06 1 70 10 "lstm" false 3 120 "36 of 120" 7848 "Piecewise" 0.001625 654 3 "Loss" "Best validation" "Single CPU" 0.021079 0.00044431 0.022755 0.00051779
8 "Complete" 100 00:21:03 2 70 10 "lstm" false 3 120 "45 of 120" 9810 "Piecewise" 0.0010563 654 3 "Loss" "Best validation" "Single CPU" 0.021588 0.00046606 0.021702 0.00047098
9 "Complete" 100 00:28:50 3 70 10 "lstm" false 3 120 "54 of 120" 11772 "Piecewise" 0.0010563 654 3 "Loss" "Best validation" "Single CPU" 0.017362 0.00030144 0.020221 0.0004089
10 "Complete" 100 00:49:01 1 100 10 "lstm" false 3 120 "72 of 120" 15696 "Piecewise" 0.00068656 654 3 "Loss" "Best validation" "Single CPU" 0.016851 0.00028394 0.019199 0.00036861
11 "Complete" 100 00:50:28 2 100 10 "lstm" false 3 120 "72 of 120" 15696 "Piecewise" 0.00068656 654 3 "Loss" "Best validation" "Single CPU" 0.016675 0.00027807 0.021528 0.00046344
12 "Complete" 100 00:41:05 3 100 10 "lstm" false 3 120 "51 of 120" 11118 "Piecewise" 0.0010563 654 3 "Loss" "Best validation" "Single CPU" 0.024376 0.00059417 0.023687 0.00056107
13 "Complete" 100 00:21:29 1 10 40 "lstm" false 3 120 "72 of 120" 15696 "Piecewise" 0.00068656 654 3 "Loss" "Best validation" "Single CPU" 0.012507 0.00015642 0.015894 0.00025262
14 "Complete" 100 00:29:07 2 10 40 "lstm" false 3 120 "120 of 120" 26280 "Piecewise" 0.00029007 654 3 "Loss" "Best validation" "Single CPU" 0.011392 0.00012978 0.014183 0.00020116
15 "Complete" 100 00:29:17 3 10 40 "lstm" false 3 120 "120 of 120" 26280 "Piecewise" 0.00029007 654 3 "Loss" "Best validation" "Single CPU" 0.014516 0.00021071 0.014807 0.00021925
16 "Complete" 100 00:35:39 1 40 40 "lstm" false 3 120 "93 of 120" 20274 "Piecewise" 0.00044627 654 3 "Loss" "Best validation" "Single CPU" 0.014429 0.0002082 0.014309 0.00020474
⋮
Measure EVM, ACPR, and NMSE
The PA might not be available during training. Measure EVM, ACPR, and NMSE metrics after training using the PA. For each trial, the helperExperimentManagerTrial
function, returns the inputs and outputs of the trial. The trialOut
structure contains the trained RNN. Pass the signals through the RNN and then pass the output of the DPD through the PA. Measure the metrics using the PA output. Append the measurements to the results table.
The processing takes about 20 minutes. To load the saved results, set processNow
to false
.
processNow =false; if processNow switch dataSource case "Saved data" expDir = fullfile(pwd,"rnn_dpd","Results","MultiNetworkRepeatTrainSavedData_Result2_20240708T130348/"); case "Simulated PA" expDir = fullfile(pwd,"rnn_dpd","Results","MultiNetworkRepeatTrain_Result7_20240702T102933/"); case "NI VST" expDir = selectExperimentResultsFolder(); end numTrials = size(resultsTable,1); resultsTable.Metrics.EVM_percent = zeros(numTrials,1); resultsTable.Metrics.ACPR_dB = zeros(numTrials,1); resultsTable.Metrics.NMSE_dB = zeros(numTrials,1); t = tic; for trial=1:numTrials if mod(trial,20) == 0 et = seconds(toc(t)); et.Format = "mm:ss"; disp(string(et)+" - Processing trial "+trial+"/"+numTrials) end [trialIn,trialOut] = helperExperimentManagerTrial(expDir,trial); % DPD dpdOutRNN = predict(trialOut.nnet,[real(txWaveTest) imag(txWaveTest)]/normFactor)*normFactor; dpdOutRNN = double(complex(dpdOutRNN(:,1),dpdOutRNN(:,2))); % PA paOutputRNN = pa(dpdOutRNN); % Metrics acprRNNDPD = helperACPR(paOutputRNN,ofdmParams); evmRNNDPD = helperEVM(paOutputRNN,qamRefSymTest,ofdmParams); nmseRNNDPD = helperNMSE(txWaveTest,paOutputRNN); % Append to table resultsTable.Metrics.EVM_percent(trial) = evmRNNDPD; resultsTable.Metrics.ACPR_dB(trial) = acprRNNDPD; resultsTable.Metrics.NMSE_dB(trial) = nmseRNNDPD; end else switch dataSource case "Simulated PA" load rnnDPDMultiNetworkRepeatTrainResultsWithMetrics resultsTable case "Saved data" load rnnDPDMultiNetworkRepeatSavedDataTrainResultsWithMetrics resultsTable otherwise error("Saved results are not available for %s", dataSource) end expDir= ""; end
Choose the RNN structure and residual connection state. Plots show the filled contour plots for EVM, ACPR, and NMSE. Darker colors show smaller (better) metrics.
networkStructure ="lstm"; residual =
false; figure fig = plotResults(resultsTable,networkStructure,residual);
Compare Optimized RNN Structures
The optimumHyperParameters
function selects trials that optimize all three metrics.
[optimTable,optimNet] = helperRNNDPDOptimumHyperParameters(resultsTable,
"EVM_percent",expDir,dataSource);
display(optimTable)
optimTable=8×9 table
Trial RNN Residual L N1 N2 EVM_percent ACPR_dB NMSE_dB
_____ ________ ________ ___ ___ __ ___________ _______ _______
22 "lstm" false 100 40 20 1.3819 -38.043 -33.812
215 "lstm" true 100 40 20 1.1153 -38.454 -35.139
89 "bilstm" false 40 100 50 1.4408 -38.568 -33.675
269 "bilstm" true 40 70 35 0.97395 -39.088 -36.02
132 "gru" false 100 70 35 1.1625 -39.263 -35.728
316 "gru" true 40 70 35 1.154 -38.812 -35.378
172 "bigru" false 40 70 35 1.1669 -39.071 -35.152
368 "bigru" true 70 70 35 0.95591 -39.345 -36.46
Display metrics and spectrum using the test data.
acprRNNDPD = optimTable.ACPR_dB; nmseRNNDPD = optimTable.NMSE_dB; evmRNNDPD = optimTable.EVM_percent; [paOutputNN,paOutputTest,evm,acpr,nmse] = helperNNDPDPerformance(txWaveTest,pa,Fs,ofdmParams,qamRefSymTest); rnnStr = optimTable.RNN; for p=1:size(rnnStr,1) if optimTable.Residual(p) rnnStr(p) = "r"+rnnStr(p); end end comparisonTable = table([acpr;acprRNNDPD],[nmse;nmseRNNDPD],[evm;evmRNNDPD], ... VariableNames=["ACPR_dB","NMSE_dB","EVM_percent"], ... RowNames=["No DPD";"mlp";rnnStr]); disp(comparisonTable)
ACPR_dB NMSE_dB EVM_percent _______ _______ ___________ No DPD -28.826 -21.289 6.8986 mlp -38.767 -33.268 1.5977 lstm -38.043 -33.812 1.3819 rlstm -38.454 -35.139 1.1153 bilstm -38.568 -33.675 1.4408 rbilstm -39.088 -36.02 0.97395 gru -39.263 -35.728 1.1625 rgru -38.812 -35.378 1.154 bigru -39.071 -35.152 1.1669 rbigru -39.345 -36.46 0.95591
numTrials = size(optimTable,1); paOutputRNN = zeros(size(txWaveTest,1),numTrials); for rnnIdx=1:size(optimTable,1) trial = optimTable(rnnIdx,:).Trial; % DPD dpdOutRNN = predict(optimNet(rnnIdx,1),[real(txWaveTest) imag(txWaveTest)]/normFactor)*normFactor; dpdOutRNN = double(complex(dpdOutRNN(:,1),dpdOutRNN(:,2))); % PA paOutputRNN(:,rnnIdx) = pa(dpdOutRNN); end
Spectrum plot shows the effect of DPD on the ACPR. Click on the legends to turn off and on the respective lines.
figure sa = helperPACharPlotSpectrum(... [paOutputTest paOutputNN paOutputRNN], ... comparisonTable.Properties.RowNames, ... ofdmParams.SampleRate,"Modulated",[-110 -50]);
release(pa)
Further Exploration
This example shows how to train multiple RNNs and compare the performance using Experiment Manager. To explore further, you can try the following:
increase the validation patience to improve neural network performance,
reduce the step size for L and N1 and run a higher fidelity search,
add N2 as an independent parameter,
try an OFDM signal with different bandwidth,
generate standard-specific signals using the Wireless Waveform Generator app.
Train a single RN configuration using the helperTrainRNNDPD
script.
Local Functions
Generate Oversampled OFDM Signals
Generate OFDM-based signals to excite the PA. This example uses a 5G-like OFDM waveform. Set the bandwidth of the signal to 100 MHz. Choosing a larger bandwidth signal causes the PA to introduce more nonlinear distortion and yields greater benefit from the addition of the DPD. Generate six OFDM symbols, where each subcarrier carries a 16-QAM symbol, using the helperNNDPDGenerateOFDM
function. Save the 16-QAM symbols as a reference to calculate the EVM performance. To capture effects of higher order nonlinearities, oversample the PA input by a factor of 5.
function [txWaveTrain,txWaveVal,txWaveTest,qamRefSymTrain,qamRefSymVal,qamRefSymTest,ofdmParams] = ... generateOversampledOFDMSignals bw = 100e6; % Hz symPerFrame = 6; % OFDM symbols per frame M = 16; % Each OFDM subcarrier contains a 16-QAM symbol osf = 5; % oversampling factor for PA input % OFDM parameters ofdmParams = helperOFDMParameters(bw,osf); % OFDM with 16-QAM in data subcarriers rng(456,"twister") [txWaveTrain,qamRefSymTrain] = helperNNDPDGenerateOFDM(ofdmParams,symPerFrame,M); [txWaveVal,qamRefSymVal] = helperNNDPDGenerateOFDM(ofdmParams,symPerFrame/3,M); [txWaveTest,qamRefSymTest] = helperNNDPDGenerateOFDM(ofdmParams,symPerFrame/3,M); end function fig = plotResults(resultsTable,networkStructure,residual) structureIdx = resultsTable{:,"Hyperparameters"}{:,"networkStructure"} == networkStructure; residualIdx = resultsTable{:,"Hyperparameters"}{:,"residual"} == residual; repeat = resultsTable{:,"Hyperparameters"}{:,"repeat"}; numRepeat = max(repeat); dataIdx = structureIdx & residualIdx; L = resultsTable{dataIdx,"Hyperparameters"}{:,"L"}; L = unique(L); N1 = resultsTable{dataIdx,"Hyperparameters"}{:,"N1"}; N1 = unique(N1); fig = figure(Position=[0 0 600 1200]); subplot(3,1,1) evm = resultsTable{dataIdx,"Metrics"}{:,"EVM_percent"}; evm = max(reshape(evm,numRepeat,[])); evm = reshape(evm,numel(N1),numel(L)); contourf(N1,L,evm); xlabel("N1") ylabel("L") zlabel("EVM") title("EVM vs. N1 and L") colorbar subplot(3,1,2) acpr = resultsTable{dataIdx,"Metrics"}{:,"ACPR_dB"}; acpr = max(reshape(acpr,numRepeat,[])); acpr = reshape(acpr,numel(N1),numel(L)); contourf(N1,L,acpr); xlabel("N1") ylabel("L") zlabel("ACPR") title("ACPR vs. N1 and L") colorbar subplot(3,1,3) nmse = resultsTable{dataIdx,"Metrics"}{:,"NMSE_dB"}; nmse = max(reshape(nmse,numRepeat,[])); nmse = reshape(nmse,numel(N1),numel(L)); contourf(N1,L,nmse); xlabel("N1") ylabel("L") zlabel("NMSE") title("NMSE vs. N1 and L") colorbar end function expDir = selectExperimentResultsFolder() resultsFolder = fullfile(".","rnn_dpd","Results"); if exist(resultsFolder,"dir") expDir = uigetdir(fullfile(".","rnn_dpd","Results"),"Select results folder"); else error("Cannot find results folder for project 'rnn_dpd'. " + ... "Run an experiment to generate results.") end end
References
[1] Z. He and F. Tong, "Residual RNN Models With Pruning for Digital Predistortion of RF Power Amplifiers," IEEE Transactions on Vehicular Technology 71, no. 9 (September 2022): 9735–9750, https://doi.org/10.1109/TVT.2022.3182233.
See Also
bilstmLayer
(Deep Learning Toolbox)
Related Examples
More About
- Deep Learning in MATLAB (Deep Learning Toolbox)
- Long Short-Term Memory Neural Networks (Deep Learning Toolbox)