How to calculate time duration between two date app designer

5 views (last 30 days)
put 2 date interval hour/minute/sec/dd/mm/yyyy and need calculate duration period on app designer

Accepted Answer

Pratik
Pratik on 5 Feb 2024
Hi Amartuvshin,
As per my understanding, in App Designer you want to take input two date interval and calculate the duration between them.
In MATLAB App Designer, you can calculate the time duration between two dates by using the datetime data type and the “between” function to compute the difference. First, you would typically have two “uidatepicker” components for the user to select the start and end dates. Then, you would have a Button that, when clicked, calculates the duration between the two dates and displays the result in a Label or any other UI component you prefer.
Please refer to the documentation of “between” for more information on calculating calendar math differences:
Please refer to the documentation of “uidatepicker” for more information on creating date picker component:
I hope this helps.
  2 Comments
Amartuvshin
Amartuvshin on 5 Feb 2024
Hi sir
I am beginner that is may first task. I am transmission engineer.
now i cant add HH:MM:SS in datepicker and push calc buttom while need calculate duration time by format day:hour:sec.
Can you help how to change formats and calculate code?
Pratik
Pratik on 5 Feb 2024
Edited: Pratik on 5 Feb 2024
Hi Amartuvshin,
Taking HH:MM:SS directly from "uidatepicker" is not possible. As a workaround you can take the time input using text-based UI editfield.
Please refer to documentation of "uieditfield" for more information on creating text or numeric edit field component:
Please refer to this MATLAB Answers post which discusses about the same issue:

Sign in to comment.

More Answers (0)

Categories

Find more on Develop Apps Using App Designer in Help Center and File Exchange

Products

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!