Using for loop for plotting from a timetable?

3 views (last 30 days)
Attached is a sample of my data that I would like to plot. I would like to use for loop to automate plotting from the timetable directly. Below is my code, however, it seems there is some problem. any thoughts would be appreciated. I would also like to get a handle to enhance the plot further.
for ii=1:2
plot(TT2.Date,TT2.(:,ii))
end

Accepted Answer

Walter Roberson
Walter Roberson on 23 Dec 2017
Edited: Walter Roberson on 23 Dec 2017
plot(TT2.Date, TT2{:,ii})
... and remember the "hold on"

More Answers (1)

Peter Perkins
Peter Perkins on 28 Dec 2017
I imagine that
plot(TT2.Date,TT2{:,1:2})
would also work. And if there's only two variables in your timetable, that's equivalent to
plot(TT2.Date,TT2.Variables)
where "Variables" is the default name to use, but it's whatever TT2.Properties.DimensionNames{2} is set to.
  2 Comments
Hydro
Hydro on 28 Dec 2017
Thanks Peter. There are a number of variables (~10). It would be very inconvenient to plot them one by one, that's why I want to use the loop to automate the plotting.
Peter Perkins
Peter Perkins on 5 Jan 2018
You only think you want a loop. This
plot(TT2.Date,TT2{:,1:2})
plots them both at once, without a loop.

Sign in to comment.

Categories

Find more on Loops and Conditional Statements in Help Center and File Exchange

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!