Clear Filters
Clear Filters

first two way-points generated by PRM are often very close together

1 view (last 30 days)
When generating paths using PRM generally the first two way-points are very close together and in 1 out 10 times can cause instability with the path following controller (only at the first way-point). If I delete one of these way-points in the plan everything works fine - any idea why PRM should generate the first two points with such close proximity evern when their position doesn't have a significant influence on the path trajectory in terms of collison avoidance of obstacles. I have tried different number of nodes and different connection distances but can still generate close points.

Answers (0)

Categories

Find more on MATLAB Report Generator in Help Center and File Exchange

Tags

Products


Release

R2017a

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!