FIR on 1 Nov 2011
I have a code below,which takes long time to run,can u tell how to process please....
Gout is my input which contains 990 rows and 4 colomns of data(990*4)
Ng=Gout
hidden_neurons =6;
epochs = 100;
wait_l = epochs*Nf;
wait_i = 0;
%h = waitbar(0,'Training Neural Network');
for i = 1:Nf
st = (i-1)*round(size(Traindata,1)/Nf)+1;
en = i*round(size(Traindata,1)/Nf);
if en>size(Traindata,1)
en=size(Traindata,1);
end
train_inp = [Traindata(1:st-1,:);Traindata(en+1:end,:)];
train_out = [Trainlabel(1:st-1,:);Trainlabel(en+1:end,:)];
test_inp = Traindata(st:en,:);
[Predicted,wait_i] = Neural1(hidden_neurons, epochs, train_inp, train_out, test_inp, wait_l, wait_i);
Training_error_NN(i,:) = sum(abs(Predicted-Trainlabel(st:en,:)));
Training_acc_NN(i,:) = accuracy(Predicted,Trainlabel(st:en,:));
end
% close(h);
pause(1);
%wait_i = 0;
%h = waitbar(0,'Testing Neural Network');
for i = 1:Nf
st = (i-1)*round(size(Testdata,1)/Nf)+1;
en = i*round(size(Testdata,1)/Nf);
if en>size(Testdata,1)
en=size(Testdata,1);
end
train_inp = Traindata;
train_out = Trainlabel;
test_inp = Testdata(st:en,:);
[Predicted,wait_i] = Neural1(hidden_neurons, epochs, train_inp, train_out, test_inp, wait_l, wait_i);
Testing_error_NN(i) = sum(abs(Predicted-Testlabel(st:en,:)));
Testing_acc_NN(i) = accuracy(Predicted,Testlabel(st:en,:));
(Testing_acc_NN')
(Testing_error_NN')
result=[fc1 Testing_acc_NN' Testing_error_NN']
end
% close(h);
pause(1);
  2 Comments
Naz
Naz on 1 Nov 2011
It takes long time to read too
FIR
FIR on 1 Nov 2011
Naz provide some suggestion

Sign in to comment.

Accepted Answer

Robert Cumming
Robert Cumming on 1 Nov 2011
you have 2 "pause" commands in the code - any idea how many times they are called?
Have you used the profiler?
profile on % then run your code
profile viewer
That will show you were your code is taking the most time.

More Answers (1)

Lulu
Lulu on 1 Nov 2011
If Nf is large, then try to vectorize FOR loop.
  1 Comment
Jan
Jan on 1 Nov 2011
I wouldn't do this. The creation of large temporary arrays is usually more time-consuming than the accleration by the vectorization. The vectorization is helpful, if the data are available as arrays already.

Sign in to comment.

Categories

Find more on Just for fun in Help Center and File Exchange

Tags

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!